1.1 |
Date updated: |
Nov 21, 2024 |
1.2 |
Vessel's name (IMO number): |
Green Azure (9934644) |
1.2b |
Is the vessel owner/manager a member of INTERTANKO? If yes, please provide IMO number of the Member organization |
No, |
1.3 |
Vessel's previous name(s) and date(s) of change: |
Not Applicable |
1.4 |
Date delivered / Builder (where built): |
Jan 03, 2023 / COSCO SHIPPING Heavy Industry (Yangzhou) Co Ltd , CHINA |
1.5 |
Flag / Port of Registry: |
Liberia / Monrovia |
1.6 |
Call sign / MMSI: |
5LFE9 / 636021686 |
1.7 |
Vessel's contact details (satcom/fax/email etc.): |
Tel: FBB: 00870773060648 , VSAT: 00870771362311 (Master's Office) & 00870771362312 (Bridge) , INM C (1): 463738293 , INM C(2): 463738294 |
Fax: |
Email: greenazure@aegean-shipping.com |
1.8 |
Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): |
Oil Tanker |
1.8a |
If other type of vessel, please specify: |
Crude oil / Product carrier |
1.9 |
Type of hull: |
Double Hull |
1.10 |
Registered owner - Full style: IMO Number |
AEGEANZHOU YPSILON INC 80 Broad Street , Monrovia Liberia IMO: 6350197 |
1.11 |
Technical operator - Full style: |
AEGEAN SHIPPING MANAGEMENT SA 10 AKTI KONDYLI AVE,PIRAEUS GREECE 18545 Greece Tel: 00302104586000 Fax: 00302104586242 Email: MARINE@AEGEAN-SHIPPING.COM Company IMO#: 1649150 |
1.12 |
Commercial operator - Full style: |
N/A |
1.13 |
Disponent owner - Full style: |
Vitol International Shipping Pte Ltd Guoco Midtown,
128 Beach Road, #28-01,
Singapore 189773 Email: greenazure.ops@vitol.com Web: n/a |
1.14 |
P & I Club - Full Style: |
Assuranceforeningen Skuld P.O.Box 1376 Vika OSLO NO-0114 , NORWAY |
1.15 |
P & I Club pollution liability coverage / expiration date: |
1,000,000,000 US$ |
Feb 20, 2025 |
1.16 |
Hull & Machinery insured by - Full Style: (Specify broker or leading underwriter) |
Allianz (Leading Underwriter) |
1.17 |
Hull & Machinery insured value / expiration date: |
US$ |
Apr 03, 2025 |
1.18 |
Classification society: |
Bureau Veritas |
1.18a |
Is Classification Society an IACS member? |
Yes |
1.19 |
Class notation: |
I +HULL , +MACH Oil tanker CSR CPS(WBT) ESP Tier III Unrestricted Navigation, CPS(COT), ESA, +VeriSTAR-HULL CM , +AUT-UMS , MON-SHAFT, GREEN PASSPORT , CLEANSHIP SUPER(BWT,GWT,OWS-5ppm), ERS-S,INWATERSURVEY, SPM,VCS,IG, ETA, LI-HG-S3 |
1.20 |
Does the vessel have any open conditions of Class?? If yes List all open conditions: |
No
|
1.20a |
Does the vessel have any Memoranda of Class? If yes, list details: |
No
|
1.21 |
If classification society changed, name of previous and date of change: |
, Not Applicable |
1.22 |
Does the vessel have ice class? If yes, state what level: |
No, N/A |
1.23 |
Date / place of last dry-dock: |
Jan 03, 2023 / Yangzhou, China |
1.24 |
Date next dry dock due / next annual survey due: |
Jan 02, 2028 |
|
1.25 |
Date of last special survey / next special survey due: |
Jan 03, 2023 |
Jan 02, 2028 |
1.26 |
If ship has Condition Assessment Program (CAP), what is the latest overall rating: |
No, |
1.27 |
Length overall (LOA): |
249.90 m |
1.28 |
Length between perpendiculars (LBP): |
245.40 m |
1.29 |
Extreme breadth (Beam): |
44.00 m |
1.30 |
Moulded depth: |
21.50 m |
1.31 |
Keel to masthead (KTM) / Keel to masthead (KTM) in collapsed condition, if applicable: |
48.25 m |
m |
1.32 |
Distance bridge front to center of manifold: |
83.50 m |
1.33 |
Bow to center manifold (BCM) / Stern to center manifold (SCM): |
124.15 m |
125.75 m |
1.34 |
Parallel body distances: |
Lightship |
Normal Ballast |
Summer Dwt |
Forward to mid-point manifold: |
29.16 m |
56.76 m |
1 m |
Aft to mid-point manifold: |
39.03 m |
53.29 m |
1 m |
Parallel body length: |
68.19 m |
110.05 m |
m |
1.35 |
Net Tonnage: |
34,706.00 |
1.36 |
Gross Tonnage / Reduced Gross Tonnage (if applicable): |
64,314.00 |
51,510 |
1.37 |
Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): |
66,585.05 |
60,366.45 |
1.38 |
Is vessel fitted for transit of Panama Canal? Panama Canal Net Tonnage (PCNT): |
Yes, 52,820.00 |
1.39 |
Loadline |
Freeboard |
Draft |
Deadweight |
Displacement |
Summer: |
7.457 m |
14.063 m |
104,999 MT |
125,021 MT |
Winter: |
7.457 m |
14.063 m |
104,999 MT |
125,021 MT |
Tropical: |
7.457 m |
14.063 m |
104,999 MT |
125,021 MT |
Normal loaded condition: |
6.52 m |
15.00 m |
114,516 MT |
134,538.80 MT |
Lightship: |
18.70 m |
2.83 m |
Not Applicable |
20,023.20 MT |
Normal Ballast Condition: |
14.32 m |
7.20 m |
38,321.10 MT |
58,344.30 MT |
Segregated Ballast Condition: |
14.32 m |
7.18 m |
38,181.10 MT |
58,204.30 MT |
1.40 |
FWA/TPC at summer draft: |
308 mm |
102.01 MT |
1.41 |
Have multiple deadweights been assigned? If yes, list all assigned deadweights: |
Yes Assigned DWT 1: 114,516.00 Assigned DWT 2: 104,999.00 Assigned DWT 3: 99,999.00 Assigned DWT 4: 89,999.00 Assigned DWT 5: 79,999.00 |
1.42 |
Constant (excluding fresh water): |
150 MT |
1.43 |
What is the company guidelines for Under Keel Clearance (UKC) for this vessel? |
During Ocean Passages: All vessels shall allow for UKC of at least 20% of vessels draft irrespective of vessels speed. Ship To Ship Operations: All vessels shall allow for UKC of at least 20% of vessels draft.
Fairways: All vessels shall allow for UKC of at least 15% of deepest draft. In Confined Waters: All vessels shall allow for UKC of at least 10% of vessels draft. Canal Passage: As per local navigation rules. SBM, CBM and Sea Island Terminals
Berths in open locations such as SBMs, Sea Island Terminals and CBM may suffer from the pronounced effects of waves. Consequently weather and sea conditions may require that consideration is given to increasing the UKC allowance to at least 15% of vessels draft. Alongside: The Master should then ensure that the UKC is MINIMUM 40 (Forty) cm while vessel is secured alongside berth. |
1.44 |
What is the max height of mast above waterline (air draft) |
Full Mast |
Collapsed Mast |
Summer deadweight: |
34.187 m |
0 m |
Normal ballast: |
39.83 m |
0 m |
Lightship: |
42.57 m |
0 m |
|
2.1 |
Safety Equipment Certificate (SEC): |
Oct 20, 2024 |
Jan 12, 2024 |
|
Jan 02, 2028 |
2.2 |
Safety Radio Certificate (SRC): |
Feb 07, 2023 |
Jan 12, 2024 |
|
Jan 02, 2028 |
2.3 |
Safety Construction Certificate (SCC): |
Oct 20, 2024 |
Jan 12, 2024 |
|
Jan 02, 2028 |
2.4 |
International Loadline Certificate (ILC): |
Feb 07, 2023 |
Jan 12, 2024 |
|
Jan 02, 2028 |
2.5 |
International Oil Pollution Prevention Certificate (IOPPC): |
Oct 20, 2024 |
Jan 12, 2024 |
|
Jan 02, 2028 |
2.6 |
International Ship Security Certificate (ISSC): |
May 08, 2023 |
Not Applicable |
Not Applicable |
May 07, 2028 |
2.7 |
Maritime Labour Certificate (MLC): |
May 08, 2023 |
Not Applicable |
|
Aug 07, 2028 |
2.8 |
Minimum Safe Manning Certificate (MSM): |
Jan 03, 2023 |
Not Applicable |
Not Applicable |
Not Applicable |
2.9 |
ISM Safety Management Certificate (SMC): |
May 08, 2023 |
Not Applicable |
Not Applicable |
Jul 07, 2028 |
2.10 |
Document of Compliance (DOC): |
Feb 13, 2023 |
|
|
Apr 21, 2028 |
2.11 |
USCG Certificate of Compliance (USCGCOC): |
Sep 22, 2023 |
Sep 22, 2024 |
Not Applicable |
Sep 22, 2025 |
2.12 |
Civil Liability Convention (CLC) 1992 Certificate: |
Feb 19, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.13 |
Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: |
Feb 19, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.14 |
Liability for the Removal of Wrecks Certificate (WRC): |
Feb 19, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.15 |
U.S. Certificate of Financial Responsibility (COFR): |
Jan 03, 2023 |
Not Applicable |
Not Applicable |
Jan 03, 2026 |
2.16 |
Certificate of Class (COC): |
Jan 03, 2023 |
Jan 12, 2024 |
Not Applicable |
Jan 02, 2028 |
2.17 |
Certificate of Registry (COR): |
Jun 27, 2023 |
Not Applicable |
Not Applicable |
Permanent |
2.18 |
International Sewage Pollution Prevention Certificate (ISPPC) |
Feb 07, 2023 |
Not Applicable |
Not Applicable |
Jan 02, 2028 |
2.19 |
Certificate of Fitness (COF): |
Not Applicable |
Not Applicable |
Not Applicable |
Not Applicable |
2.20 |
International Energy Efficiency Certificate (IEEC): |
Oct 20, 2024 |
Not Applicable |
Not Applicable |
Not Applicable |
2.21 |
International Air Pollution Prevention Certificate (IAPPC): |
Mar 06, 2023 |
Jan 12, 2024 |
|
Jan 02, 2028 |
2.22 |
Ship Sanitation Control (SSCC)/Ship Sanitation Control Exemption (SSCE): |
Aug 07, 2024 |
Not Applicable |
Not Applicable |
Feb 07, 2025 |
2.23 |
Does the vessel have an International Ballast Water Management Certificate? If no, then describe how ship complies with the "International Convention for the Control and Management of Ships' Ballast Water and Sediments"?: |
Yes, |
2.24 |
Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: |
Yes |
2.25 |
Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? |
Yes |
2.26 |
Is the ITF Special Agreement on board (if applicable)? |
Yes |
2.27 |
ITF Blue Card expiry date (if applicable): |
Jan 02, 2025 |
|
3.1 |
Nationality of Master: |
Filipino |
3.2 |
Number and nationality of Officers: |
9 |
Filipino |
3.3 |
Number and nationality of Crew: |
Nationality | Count |
---|
PHILIPPINES | 11 |
|
3.4 |
What is the common working language onboard: |
English |
3.5 |
Do officers speak and understand English? |
Yes |
3.6 |
If Officers/ratings employed by a Manning Agency - Full style: |
Officers:
Company Name | Address | Phone | Fax | Email |
---|
Bright Maritime Corporation | 5th and 6th Maritime Plaza Tower, A.Flore Street , Corner Calle Cortada Ermita Manila 1000 | 006324056702 | 006324056700 | tankerdept@yahoo.com , brightmanilatanker@gmail.com |
Ratings:
|
|
4.1 |
Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? |
Yes |
4.2 |
Qualified individual (QI) - Full style: |
Hudson Marine Management Service |
4.3 |
Oil Spill Response Organization (OSRO) - Full style: |
Marine Spill Response Corporation 220 Spring Street, Suite 500 , Herndon , VA20170 Tel: 0017033265600 Fax: 0017033265660 Web: WWW.MSRC.ORG |
4.4 |
Salvage and Marine Firefighting Services (SMFF) - Full Style: |
T&T Salvage LLC 8717 Humble Westfield Road, Humble , TX77338 Tel: 0017135340700 Email: info@ttsalvage.com Web: www.ttsalvage.com |
|
5.1 |
Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): |
Yes A.741(18) |
5.2 |
Can the ship comply with the ICS Helicopter Guidelines? |
Yes |
5.2.1 |
If Yes, state whether winching or landing area provided: |
Landing |
5.2.2 |
If Yes, what is the diameter of the circle provided: |
14.00 m |
|
6.1 |
Cargo tanks:
Tank ID | Tank PSC | Tank Type | Constr | Coated Y/N | Coating Type | Extent | Condition | Date | Insp date | Insp Freq |
---|
1 | S | NA | Mild Steel | yes | Epoxy | Bottom Only | Good | 2022-11-07 | 2022-12-29 | 30 Months | 2 | P | NA | Mild Steel | yes | Epoxy | Bottom Only | Good | 2022-11-07 | 2022-12-29 | 30 Months | 3 | S | NA | Mild Steel | yes | Epoxy | Bottom Only | Good | 2022-11-07 | 2022-12-29 | 30 Months | 5 | P | NA | Mild Steel | yes | Epoxy | Bottom Only | Good | 2022-11-07 | 2022-12-29 | 30 Months | 5 | S | NA | Mild Steel | yes | Epoxy | Bottom Only | Good | 2022-11-07 | 2022-12-29 | 30 Months | 1 | P | NA | Mild Steel | yes | Epoxy | Bottom Only | Good | 2022-11-07 | 2022-12-29 | 30 Months | 6 | P | NA | Mild Steel | yes | Epoxy | Bottom Only | Good | 2022-11-07 | 2022-12-29 | 30 Months | 3 | P | NA | Mild Steel | yes | Epoxy | Bottom Only | Good | 2022-11-07 | 2022-12-29 | 30 Months | 4 | P | NA | Mild Steel | yes | Epoxy | Bottom Only | Good | 2022-11-07 | 2022-12-29 | 30 Months | 2 | S | NA | Mild Steel | yes | Epoxy | Bottom Only | Good | 2022-11-07 | 2022-12-29 | 30 Months | 6 | S | NA | Mild Steel | yes | Epoxy | Bottom Only | Good | 2022-11-07 | 2022-12-29 | 30 Months | 7 | P | Slop | Mild Steel | yes | Epoxy | Full Tank | Good | 2022-11-07 | 2022-12-29 | 30 Months | 4 | S | NA | Mild Steel | yes | Epoxy | Bottom Only | Good | 2022-11-07 | 2022-12-29 | 30 Months | 7 | S | Slop | Mild Steel | yes | Epoxy | Full Tank | Good | 2022-11-07 | 2022-12-29 | 30 Months |
Anodes Fitted: No |
Ballast tanks:
ID | Coated? | Type | Extent | Condition | Coating date | Insp date | Insp freq |
---|
No 3 P | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | No 3 S | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | No 4 S | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | APT | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | No 1 P | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | No 5 S | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | No 6 P | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | No 2 S | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | No 6 S | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | No 4 P | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | No 1 S | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | FPT | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | No 5 P | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual | No 2 P | No | Epoxy | Full Tank | Good | 2022-09-20 | 2023-12-05 | Annual |
Anodes Fitted: Yes |
|
7.1 |
Ballast Handling Data
Number | Type | Prime mover type | Capacity (m3/hr) | Head (bar) |
---|
2 | Eductors | Via water by ballast pump | 150.00 | 20.00 | 2 | Centrifugal | Electric | 2000.00 | 30.00 |
|
7.2 |
Does the vessel comply with D1 or D2 performance standards? |
D2 |
7.3 |
Does the vessel have a Ballast Water Treatment System (BWTS) fitted? |
Yes |
7.4 |
What type of BWTS fitted? If other system fitted, please advise: |
Other (specify), Chemical Electrolysis |
7.5 |
Name of manufacturer of BWTS: |
SUNRUI BALCLOR Marine Environmental Engineering Co Ltd , Model :BC-4000 |
7.6 |
Does the BWTS have IMO type approval? |
Yes |
7.7 |
Is the BWTS of a USCG approved type? |
Yes |
|
8.1 |
Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: |
Yes, Solid |
8.2 |
Cargo Tank Capacities at 98% Full - Centre:
Total Centre: m3
Cargo Tank Capacities at 98% Full - Wing:
Tank Number | Capacity (m3) | P/S |
---|
No 1 | 7117.87 | Port | No 2 | 10991.96 | Port | No 6 | 10712.65 | Stbd | No 1 | 7117.87 | Stbd | No 4 | 11235.93 | Port | No 6 | 10712.65 | Port | No 3 | 11235.94 | Stbd | No 5 | 11235.94 | Stbd | No 3 | 11235.94 | Port | No 2 | 10991.96 | Stbd | No 5 | 11235.94 | Port | No 4 | 11235.93 | Stbd |
Total Wing: 125,060.58 m3
Deck Tank Capacities at 98% Full:
Total Deck: m3
|
8.2.1 |
Capacity (98%) of each natural segregation with double valve (specify tanks): |
No 1 Group : 38509.43 (1ws/4ws/SP)
No 2 Group : 46640.66 (2ws/5ws/SS)
No 3 Group : 43897.18 (3ws/6ws) |
8.2.2 |
IMO class (Oil/Chemical Ship Type 1, 2 or 3): |
(N/A) |
8.3 |
Slop tank capacities (98%):
Tank Number | Capacity (m3) | P/S |
---|
Slop | 1801.80 | Port | Slop | 2184.86 | Stbd |
Total: 3,986.66 m3
|
8.3.1 |
Specify segregations which slops tanks belong to and their capacity with double valve: |
Slop P belongs to Group No1 (1&4ws) , Capacity 98%:38509.41 Cu.Meters
Slop S belongs to Group No2 (2&5ws) , Capacity 98%:46640.66 Cu.Meters |
8.3.2 |
Residual/Retention oil tank(s) capacity (98%), if applicable: |
377.85 m3 |
8.3.3 |
What is total SBT capacity and percentage of SDWT vessel can maintain? |
41,371.65 m3 |
36.127 % |
8.3.4 |
Does vessel meet the requirements of MARPOL Annex I Reg 18.2: |
Yes |
8.4 |
How many grades/products can vessel load/discharge with double valve segregation: |
3 |
8.4.1 |
State type of cargo containment (integral, independent, gravity or pressure tanks): |
|
8.5 |
Max loading rate for homogenous cargo |
With VECS |
Without VECS |
Loaded per manifold connection: |
3,600 m3/hr (Max loading rate per manifold connection can be much higher provided that the cargo is homogenous and the common line (after the manifolds) is open for all or more than 1 loading group.) |
3,600.00 m3/hr (Max loading rate per manifold connection can be much higher provided that the cargo is homogenous and the common line (after the manifolds) is open for all or more than 1 loading group.) |
Loaded simultaneously through all manifolds: |
10,800.00 m3/hr |
10,800.00 m3/hr |
8.6 |
Is ship fitted with a Cargo Control Room (CCR)? |
Yes |
8.7 |
Can tank innage / ullage be read from the CCR? |
Yes |
8.8 |
Is gauging system certified and calibrated? If no, specify which ones are not calibrated: |
Yes, |
|
What type of gauging system as per IBC 13.1 is fitted (Open/Restricted/Closed): |
|
|
What type of fixed closed tank gauging system is fitted: |
Radar |
|
Are high level alarms fitted to the cargo tanks? If Yes, indicate whether to all tanks or partial: |
Yes, Yes |
8.9 |
Can cargo be transferred under closed loading conditions in accordance with ISGOTT 11.1.6.6? |
Yes |
8.9.1 |
Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: |
No, |
8.10 |
Number of portable gauging units (example- MMC) on board: |
4 |
8.11 |
Is a Vapour Emission Control System (VECS) fitted? |
Yes |
|
If fitted, is vapour line return manifold in compliance with OCIMF Guidelines? |
Yes |
|
If fitted, how many vapor return segregations can the vessel maintain simultaneously? |
1 |
|
Does the ship possess Vapour Emission Control (VEC) Certification? If yes, state the issuing authority |
Yes, BV |
8.12 |
Number/size of VECS manifolds (per side): |
2 |
450 mm |
8.13 |
Number / size / type of VECS reducers: |
18" X 12" 2pcs , 18" X 16" 4pcs |
8.14 |
State what type of venting system is fitted: |
Mast Riser and PV Valves individual on each COT |
8.15 |
Total number/size of cargo manifold connections on each side:
No.: 3
Size:
Manifold | PCS | Size | Unit | Pressure Rating | Unit PR | Standard |
---|
2 | P | 500 | mm | 15 | Bar | ANSI | 1 | P | 500 | mm | 15 | Bar | ANSI | 3 | S | 500 | mm | 15 | Bar | ANSI | 2 | S | 500 | mm | 15 | Bar | ANSI | 3 | P | 500 | mm | 15 | Bar | ANSI | 1 | S | 500 | mm | 15 | Bar | ANSI |
|
8.16 |
What type of valves are fitted at manifold: |
Butterfly, |
8.17 |
What is the material/rating of the manifold: |
Steel / ANSI |
8.17.1 |
Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment'? |
Yes |
8.18 |
Distance between cargo manifold centers: |
2,500.00 mm |
8.19 |
Distance ships rail to manifold: |
4,357.00 mm |
8.20 |
Distance manifold to ships side: |
4,600.00 mm |
8.21 |
Top of rail to center of manifold: |
845.00 mm |
8.22 |
Distance main deck to center of manifold: |
2,100.00 mm |
8.23 |
Spill tank grating to center of manifold: |
900.00 mm |
8.24 |
Manifold height above the waterline in normal ballast / at SDWT condition: |
16.36 m |
1 m |
8.25 |
Number / size / type of reducers: |
6 x 500/400mm (20/16") 3 x 500/200mm (20/8") 3 x 500/250mm (20/10") 3 x 500/300mm (20/12") ANSI |
8.26 |
Is vessel fitted with a stern manifold? If yes, state size: |
No, mm |
8.27 |
Provide details of Heating Coils/Heat Exchangers |
Tank ID | P/C/S/ Decktank/ Other | Heat exchanger | Internal/External | External ducts | Heating coils | Heating coil sets | Height of the heating coils above tank bottom (mm) | total heating surface (m2) | Ratio of the heating surface | Welded or coupled | Material |
---|
4 | P | no | Internal | no | yes | 4 | 200.00 | 152.18 | 0.01 | Welded | SS | 1 | P | no | Internal | no | yes | 4 | 200.00 | 104.76 | 0.01 | Welded | SS | 4 | S | no | Internal | no | yes | 4 | 200.00 | 152.18 | 0.01 | Welded | SS | 0 | P | no | Internal | no | yes | 2 | 200.00 | 4.50 | 0.01 | Welded | SS | 7 | S | no | Internal | no | yes | 3 | 200.00 | 52.52 | 0.02 | Welded | SS | 1 | S | no | Internal | no | yes | 4 | 200.00 | 104.76 | 0.01 | Welded | SS | 3 | S | no | Internal | no | yes | 4 | 200.00 | 152.18 | 0.01 | Welded | SS | 6 | P | no | Internal | no | yes | 4 | 200.00 | 146.62 | 0.01 | Welded | SS | 6 | S | no | Internal | no | yes | 4 | 200.00 | 146.62 | 0.01 | Welded | SS | 3 | P | no | Internal | no | yes | 4 | 200.00 | 152.18 | 0.01 | Welded | SS | 2 | P | no | Internal | no | yes | 4 | 200.00 | 149.30 | 0.01 | Welded | SS | 7 | P | no | Internal | no | yes | 3 | 200.00 | 43.22 | 0.02 | Welded | SS | 5 | P | no | Internal | no | yes | 4 | 200.00 | 152.18 | 0.01 | Welded | SS | 2 | S | no | Internal | no | yes | 4 | 200.00 | 149.30 | 0.01 | Welded | SS | 5 | S | no | Internal | no | yes | 4 | 200.00 | 152.18 | 0.01 | Welded | SS |
|
8.27.1 |
Is a Thermal Oil Heating system fitted? If yes, identify tanks? |
N/A, |
8.28 |
Maximum temperature cargo can be loaded / maintained: |
70.0 °C / 158.0 °F |
60 °C / 140 °F |
8.28.1 |
Minimum temperature cargo can be loaded / maintained: |
|
|
8.29 |
Is an Inert Gas System (IGS) fitted / operational? |
Yes / Yes |
8.29.1 |
Is a Crude Oil Washing (COW) installation fitted / operational? |
Yes / Yes |
8.30 |
Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: |
Flue Gas |
8.30.1 |
If nitrogen generator, specify the applicable flow rate for each of the designed purity modes: |
|
8.31 |
How many cargo pumps can be run simultaneously at full capacity: |
3 |
8.32 |
Cargo Pump Data |
Pump Identity | Pump Location | Type | Type of prime mover | Capacity | At what head? |
---|
No 3 COP | Pumproom | Centrifugal | Steam | 3000.00 | 130.00 | No1 COP | Pumproom | Centrifugal | Steam | 3000.00 | 130.00 | No 2 COP | Pumproom | Centrifugal | Steam | 3000.00 | 130.00 |
|
|
9.1 |
Provide details for Mooring Ropes, Wires, Tails and Shackles |
Type | Location and Identity | Material | Diameter/size | Length | LDBF(100-105 % of SDMBL (Tonnes)) | TDBF(125-130 % of SDMBL (Tonnes) | SWL (tonnes) | WLL (tonnes) (50-55% of Max LDBF) | Certificate No. | Installed Date | Reversed Date | Renewal2 Date | Status of line/tail | Condition of line/tail |
---|
Mooring Wires | Main Deck, 4 pcs | Galvanized | 36.00 | 220.00 | 74.00 | 0.00 | 74.00 | 0.00 | 222003043A-7 to 10 | 2022-12-20 | 2025-06-20 | 2027-06-20 | In Use | Suitable | Mooring Wires | Forecastle , 6 pcs | Galvanized | 36.00 | 220.00 | 74.00 | 0.00 | 74.00 | 0.00 | 222003043A-1 to 6 | 2022-12-20 | 2025-06-20 | 2027-06-20 | In Use | Suitable | Mooring Wires | Poop Deck, 6pcs | Gakvanized | 36.00 | 220.00 | 74.00 | 0.00 | 74.00 | 0.00 | 222003043A-11-16 | 2022-12-20 | 2025-06-20 | 2027-06-20 | In Use | Suitable | Tails | FWD, AFT and Main Deck | 50/50 KAPA MAX | 90.00 | 11.00 | 0.00 | 95.00 | 74.00 | 0.00 | Available Upon Request. | 2024-04-15 | 2024-04-15 | 2024-04-15 | In Use | Suitable |
|
9.2 |
Details of winches and brake testing including rendering loads |
Mooring winch Location | Split Drum | Motive Power | Remote Operational controls | Heaving power | Hauling Speed | Type of Brake | Designed Brake Max holding load (ISO) (80% of SDMB | Operational brake holding load (60% of SDMBL) | Date of last brake test | Brake Rendering load | Frequency of testing brakes |
---|
3 | No | Hydraulic | No | 20.40 | 0.25 | Spring | 59.00 | 44.40 | 2023-12-21 | 44.4 | Yearly | 1 | No | Hydraulic | No | 20.40 | 0.25 | Spring | 59.00 | 44.40 | 2023-12-21 | 44.4 | Yearly | 2 | No | Hydraulic | No | 20.40 | 0.25 | Spring | 59.00 | 44.40 | 2023-12-21 | 44.4 | Yearly |
|
9.3 |
Provide Details of Mooring bollards and bitts |
Location | Identity No | Certificate Number | Size (mm) | SWL (tonnes) |
---|
Forecastle | 1 | ISO 13795-2012 | 480 | 74 | Forecastle | 2 | ISO 13795-2012 | 480 | 74 | Forecastle | 3 | ISO 13795-2012 | 480 | 74 | Forecastle | 4 | ISO 13795-2012 | 480 | 74 | Forecastle | 5 | ISO 13795-2012 | 480 | 74 | Forecastle | 6 | ISO 13795-2012 | 480 | 74 | Forecastle | 7 | ISO 13795-2012 | 480 | 74 | Forecastle | 8 | ISO 13795-2012 | 480 | 74 | Forecastle | 9 | ISO 13795-2012 | 480 | 74 | Forecastle | 10 | ISO 13795-2012 | 480 | 74 | Maindeck Forward (Port) | 1 | ISO 13795-2012 | 480 | 74 | Maindeck Forward (Stbd) | 1 | ISO 13795-2012 | 480 | 74 | Poop Deck (Port) | 1 | ISO 13795-2012 | 480 | 74 | Poop Deck (Port) | 2 | ISO 13795-2012 | 480 | 74 | Poop Deck (Port) | 3 | ISO 13795-2012 | 480 | 74 | Poop Deck (Port) | 4 | ISO 13795-2012 | 480 | 74 | Poop Deck (Port) | 5 | ISO 13795-2012 | 480 | 74 | Poop Deck (Port) | 6 | ISO 13795-2012 | 480 | 74 | Poop Deck (Stbd) | 1 | ISO 13795-2012 | 480 | 74 | Poop Deck (Stbd) | 2 | ISO 13795-2012 | 480 | 74 | Poop Deck (Stbd) | 3 | ISO 13795-2012 | 480 | 74 | Poop Deck (Stbd) | 4 | ISO 13795-2012 | 480 | 74 | Poop Deck (Stbd) | 5 | ISO 13795-2012 | 480 | 74 | Poop Deck (Stbd) | 6 | ISO 13795-2012 | 480 | 74 |
|
9.4 |
Provide details of Mooring Fairleads/Chocks |
Type | Location | Identity No | Certificate | Size (mm) | SWL (tonnes) | Modifications | If yes, are modifications class approved? |
---|
Closed chock | Forecastle | 1 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 2 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 3 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 4 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 5 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 6 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 7 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 8 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 9 | YFTD-SD2000-04 | 600 | 207 | no | no | Closed chock | Forecastle | 10 | YFTD-SD2000-04 | 600 | 204 | no | no | Closed chock | Forecastle | 11 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 12 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 13 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 14 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 15 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 16 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 17 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Forecastle | 18 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Maindeck Forward (Port) | 1 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Maindeck Forward (Port) | 2 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Maindeck Forward (Port) | 3 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Maindeck Forward (Stbd) | 1 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Maindeck Forward (Stbd) | 2 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Maindeck Forward (Stbd) | 3 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Port) | 1 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Port) | 2 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Port) | 3 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Port) | 4 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Port) | 5 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Port) | 6 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Port) | 7 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Port) | 8 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Port) | 9 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Port) | 10 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Port) | 11 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Stbd) | 12 | YFTD-SD2000-04 | 600 | 204 | no | no | Closed chock | Poop Deck (Stbd) | 13 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Stbd) | 14 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Stbd) | 15 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Stbd) | 16 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Stbd) | 17 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Stbd) | 18 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Stbd) | 19 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Stbd) | 20 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Stbd) | 21 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Stbd) | 22 | ISO 13729-2012 | 500 | 74 | no | no | Closed chock | Poop Deck (Stbd) | 23 | ISO 13729-2012 | 500 | 74 | no | no | Universal roller fairlead | Forecastle | 1 | ISO 13776-2012 | 0 | 74 | no | no | Universal roller fairlead | Forecastle | 2 | ISO 13776-2012 | 0 | 74 | no | no | Universal roller fairlead | Forecastle | 3 | ISO 13776-2012 | 0 | 74 | no | no | Universal roller fairlead | Forecastle | 4 | ISO 13776-2012 | 0 | 74 | no | no | Universal roller fairlead | Forecastle | 5 | ISO 13776-2012 | 0 | 74 | no | no | Universal roller fairlead | Forecastle | 6 | ISO 13776-2012 | 0 | 74 | no | no | Universal roller fairlead | Forecastle | 7 | ISO 13776-2012 | 0 | 74 | no | no |
|
9.5 |
Number of shackles on port / starboard cable: |
13.00 / 13.00 |
9.6 |
Type / SWL of Emergency Towing system forward: |
A set of 76mm Chain |
250 MT |
9.7 |
Type / SWL of Emergency Towing system aft: |
ETS Escorting and Pull back system strong point |
204 MT |
9.8 |
What is size of closed chock and/or fairleads of enclosed type on stern: |
600x450 |
9.9 |
What is SWL of closed chock and/or fairleads of enclosed type on stern: |
90.00 MT |
9.10 |
What is SWL of bollard on poop deck suitable for escort tug: |
90.00 MT |
9.11 |
Derrick / Crane description (Number, SWL and location): |
Cranes: 2 x 15.00 Tonnes Port and Stbd side midships |
9.12 |
Accommodation ladder direction: |
Aft |
9.13 |
Does vessel have a portable gangway? If yes, state length: |
Yes |
18 m |
9.14 |
Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? |
Yes |
9.15 |
If fitted, how many chain stoppers: |
2 |
9.16 |
Details of Bow chain stoppers:
Location/Number of Bow Chain Stopper | Type | Operation | SWL | Min Size of Chain | Max size of Chain |
---|
Port | Tongue | Manual | 250.00 | 76.00 | 76.00 | Stbd | Tongue | Manual | 250.00 | 76.00 | 76.00 |
|
9.17 |
Distance between the bow fairlead and chain stopper/bracket: |
3.10 m |
9.18 |
Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: |
Yes
|
|
10.1 |
Speed |
Maximum |
Economical |
Ballast speed: |
14 Kts (WSNP) |
12 Kts (WSNP) |
Laden speed: |
13.50 Kts (WSNP) |
12 Kts (WSNP) |
10.2 |
What type of fuel is used for main propulsion? If other, then specify: |
Other (specify), HSFO. VLSFO , MGO |
|
What type of fuel is used for generating plant |
HSFO, VLSFO, MGO |
10.3 |
Bunker Tank Capacities:
Tank Name | Bunker Type | Tank Type | Capacity | Max Pressure |
---|
N0 2 VLSFO SERV | Other (specify) | Service Tank | 38.96 | 5.00 | MGO | Other (specify) | Main Bunker Tank | 644.81 | 5.00 | No 1 VLSFO (P) | Other (specify) | Main Bunker Tank | 627.07 | 5.00 | N0 1 VLSFO SET | Other (specify) | Settling Tank | 41.06 | 5.00 | No 2 VLSFO SET | Other (specify) | Settling Tank | 41.06 | 5.00 | MGO SERV | Other (specify) | Service Tank | 55.40 | 5.00 | No 2 VLSFO (S) | Other (specify) | Main Bunker Tank | 940.75 | 5.00 | No 1 VLSFO SERV | Other (specify) | Service Tank | 38.96 | 5.00 | No 1 VLSFO (S) | Other (specify) | Main Bunker Tank | 787.12 | 5.00 |
If other, then specify |
10.4 |
Is vessel fitted with fixed or controllable pitch propeller(s): |
Fixed |
10.5 |
Engines |
No |
Capacity |
Make/Type |
Main engine: |
1 |
11,350 Kw |
MAN BW 6G60ME-C9.5-HPSCR TIER III |
Aux engine: |
3 |
1,050 Kw |
YANMAR 6EY22ALWS |
Power packs: |
|
m3/hr |
|
Boilers: |
2 |
30.00 MT/Hr |
KANGRIM |
10.6 |
What is brake horse power of bow thruster (if fitted): |
No, bhp |
10.7 |
What is brake horse power of stern thruster (if fitted): |
No, bhp |
10.8 |
Does the vessel have an EEDI Rating number? If yes then provide EEDI rating: |
Yes, 2.95 |
|
If No then provide reason: |
|
|
Is the EEDI rating verified by Class, 3rd Party or Owner? |
Class |
10.9 |
Does the vessel have an EEXI Rating number? If yes then provide EEXI rating: |
Yes, 2.99 |
|
If No then provide reason: |
|
|
Is the EEXI rating verified by Class, 3rd Party or Owner? |
Class |
10.10 |
Does the vessel have a CII Rating number? If yes then provide CII rating: |
Yes, B |
|
If No then provide reason: |
|
|
Is the CII rating verified by Class, 3rd Party or Owner? |
|
10.11 |
Does the vessel have an EIV Rating number? If yes then provide EIV rating: |
, |
|
If No then provide reason: |
|
|
Is the EIV rating verified by Class, 3rd Party or Owner? |
|
10.12 |
What is the ships NOx control level (Tier I, Tier II, and Tier III)?: |
Tier III |
|
List of equipment fitted for NOx Tier III achievement for all engines (LP Selective catalytic reduction, HP Selective catalytic reduction, Exhaust gas recirculation, Alternative fuel etc...) |
HP Selective catalytic reduction |
10.13 |
Does the vessel use an Exhaust Gas Cleaning System? |
Yes |
10.14 |
What is the type of scrubber fitted as part of the EGCS onboard? |
Open Loop |
|
11.1 |
Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? |
Yes |
11.2 |
What is maximum outreach of cranes / derricks outboard of the ship's side: |
9.48 m |
11.3 |
Date/place of last STS operation: |
CORPUS CHRISTI 05/07/2024 |
11.4 |
Does the vessel have a ship specific STS plan: |
|
|
12.1 |
Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): |
|
12.2 |
Has ship been involved in a pollution, grounding, collision or allision incident during the past 12 months? If yes, provide details: No
|
12.3 |
Date and place of last Port State Control inspection: |
Jun 07, 2024, Quebec |
12.4 |
Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: |
No N/A |
12.5 |
Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:
*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis. |
Contact owner for details. |
12.6 |
Date / place of last SIRE inspection: |
Aug 07, 2024 / Rotterdam |
12.6.1 |
Date / place of last CDI inspection: |
N/A |
12.7 |
Additional information relating to features of the ship or operational characteristics: |
|