HN 1200

Principal Particulars

L.O.A. 284.80 m
Br 44.00 m
Summer draft 15.00 m
Main Engine MAN B&W 6G60ME-C10.5 HPSCR Tier III
Speed 14.50 knots
Capacity of D/G 1300kw
Propeller Fixed pitch, 4 bladed solid, keyless Nickel aluminum bronze

Class Notations

I, +HULL, +MACH, Oil tanker, CSR, CPS(WBT), ESP, Unrestricted Navigation, UT-UMS, VCS, MON-SHAFT, SPM , INWATERSURVEY, CLEANSHIP, BWT, CPS(COT) GREEN PASSPORT

Aegean Shipping Management and COSCO Shipping Heavy Industry Yangzhou reached an agreement for the construction of two + two tankers, LR2 type ice class 1C, with a carrying capacity of 114,000 dwt each.

These are ships with:

  • the most modern and at the same time high-quality and sustainable equipment
  • complying with Energy Efficiency Design Index (EEDI) – Phase III
  • the latest version of MAN B&W electronic Engine (ensures optimal fuel consumption & Environmental Compliance equipped with HPSCR system for NOx reduction)
  • Sufficient Power reserves by large Diesel Generator allowing future retrofits to be implemented if required.
  • LED lighting (reduce energy consumption and the generation of hazardous materials)
  • frequency converters installed on various consumers in Engine Room achieving energy savings
  • latest technology of advanced low-friction, and self lubricating antifouling with extended idle time

Moreover, the ships will have installed:

  • proven state-of-the-art marine ballast treatment systems
  • reliable and Efficient Exhaust Gas Cleaning System
  • energy saving devices like Pre-shrouded Vanes (PSV) and Hub Vortex Absorber Fins (HVAF)

Structure with status of delivery

The progress of building a new green ship is carried out in 10 main stages

Current State signing the contract
Current State steel pretreatment & cutting
Current State pre-outfitting of select components
Current State Erection: the ship’s hull is built from the assembled & painted blocks
Current State The performance of the ship is tested & in the presence of the buyer & the classification surveyor
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
Current State designing the vessel(3D cad system)
Current State Assembly(the steel plates are assembled to a block by welding & 5 assembly yards can produce 1200 tons per month)
Current State painting: sections are painted according to spec
Current State The finished hull is slipped into the sea
Current State Delivery: The builder delivers the vessel to the buyer & a Protocol of Delivery & Acceptance is signed.
Current State signing the contract 1
Current State designing the vessel(3D cad system) 2
Current State steel pretreatment & cutting 3
Current State Assembly(the steel plates are assembled to a block by welding & 5 assembly yards can produce 1200 tons per month) 4
Current State pre-outfitting of select components 5
Current State painting: sections are painted according to spec 6
Current State Erection: the ship’s hull is built from the assembled & painted blocks 7
Current State The finished hull is slipped into the sea 8
Current State The performance of the ship is tested & in the presence of the buyer & the classification surveyor 9
Current State Delivery: The builder delivers the vessel to the buyer & a Protocol of Delivery & Acceptance is signed. 10

Privacy Preference Center

Necessary

Aegean Shipping uses cookies, or tiny pieces of information stored on your computer, to verify who you are. There are cookies for logged in users and for commenters.

_icl_current_language, gdpr[allowed_cookies], gdpr[consent_types], wp-settings-1, wp-settings-time-1, wordpress_logged_in_, wordpress_test_, wordpress_test_cookie

Advertising

Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

_dc_gtm_, _ga, _gid

Other